The Ultimate PRINCE2 Change Budget Guide for Exams
Hey there, budding PRINCE2 enthusiasts! So you’ve been diving deep into PRINCE2 and stumbled upon the elusive term “change budget”.
With exams around the corner, you need the scoop, right? Look no further – we’re breaking down the change budget for you and including real-world examples.
What’s This Change Budget All About?
First things first, let’s demystify the term. In the world of PRINCE2, a change budget isn’t just the spare change you find under your couch cushions. Nope, it’s a dedicated chunk of money set aside expressly to manage changes during a project. And trust me. Changes will come up. They always do.
Why Do We Even Need One?
Imagine you’re working on a massive project, like designing a super-cool app. You’ve got everything sorted, and then – bam! – your client wants an extra feature. But wait, that feature costs money! With a change in budget, you can find funds and avoid tough conversations with your client. No fun, right? That’s where the change budget swoops in to save the day.
All right, But How’s It Work?
Let’s break down how to incorporate this into a project:
1. Setting the Stage Before the project starts, identify potential areas where changes might arise. It could be in the design phase or during testing. Knowing where changes are most likely helps in setting a realistic change budget.
Example: You’re planning an event and think, “What if the headliner drops out last minute?” So, you keep a bit extra in your change budget to cover unexpected artist fees.
2. The Allocation Game Figure out the right amount to allocate. Review past projects for guidance, consider their complexity, and be objective about their uncertainty levels. Then, put aside funds accordingly.
Example: You’re building a website. In the past, clients often asked for extra pages. Allocate funds in your change budget for potential additional page designs.
3. Roll With the Changes As the project unfolds, you’ll get change requests. Some might be minor, others more significant. Draw from your change budget to handle these, keeping a close eye on how much remains.
Example: Midway through constructing a building, the owner wants marble floors instead of tile. Luckily, your change budget covers the difference in material costs.
4. Regular Check-ins Frequently review the budget. If you notice you’re burning through it fast, reassess and communicate with your stakeholders. You may need a budget increase, or some change requests need re-evaluation.
Example: In developing a video game, the team requests several character redesigns. With the low change budget, it’s time for a sit-down to prioritize changes.
5. The Close-out Once your project wraps up, review how you used the change budget. What went well? Where did you face challenges? Learn from this, and your next project will be even smoother.
Example: After launching a marketing campaign, you realized many changes were related to ad graphics. For future campaigns, consider allocating more for graphic design changes.
The Golden Rule
Always remember that a change in budget isn’t an excuse for poor planning. It’s a tool for adapting to the ever-evolving nature of projects because a project that goes 100% according to plan is as rare as unicorns.
ALWAYS REMEMBER: You must never use available Tolerances to pay for changes!
Very good! Now include the different types of changes that may occur.
These are typically Off-Specifications, Requests for Change, or general issues such as problems or concerns, including the PRINCE2 approach to change control regarding the authority level needed to approve or otherwise such changes.
Navigating PRINCE2 Change Budgets: Types of Changes & Who Gets to Call the Shots
Let me dive even deeper into the change budget and mix in some of the typical changes you’ll encounter. Not just that, we will uncover the ‘who-does-what’ when these changes arise. Ready to become a change pro? Let’s roll!
Change Budget 101: A Quick Recap
Before we hit the new stuff, a tiny refresher: a change budget is like your project’s safety net. It’s the stash you’ve set aside to manage those unexpected twists and turns during any project. Because let’s be honest, no project is a smooth sail from start to finish.
So, What Kind of Changes Are We Talking About?
1. Off-Specifications
This one’s all about something needing to meet initial requirements. Think of ordering a vanilla latte and getting a caramel one instead. It’s off specification because it was not what you ordered.
Example: Your software project was supposed to include a dark mode feature, but it doesn’t. That’s an off-specification.
2. Requests for Change (RFC)
Suppose someone wants something new or different from what was planned initially. You might have encountered this when your friend, watching you make a sandwich, suddenly asks for pickles even though pickles weren’t on the menu.
Example: Midway through a building project, there’s a request to add a rooftop garden. Yep, that’s an RFC.
3. General Issues
These are the unexpected problems or concerns that pop up. Ever planned a picnic and then realized you forgot the blanket? Yep, that’s a general issue.
Example: While organizing a large-scale event, you discover the venue isn’t available on your chosen date. That, my friend, is a general issue.
Who Gets to Make the Decisions?
PRINCE2 isn’t about chaos. There’s a clear structure on who gets to approve changes or tackle issues.
1. For Minor Changes:
The Project Manager typically has the authority. They can decide if the change is minor enough and whether the change budget can cover it.
2. For Bigger or More Significant Changes:
This is where the Change Authority comes in, a group (or sometimes an individual) responsible for decisions that fall outside the Project Manager’s limits. They’re the ones who will weigh the pros and cons of a Request for Change or address major Off-Specifications.
By default the Project Board are the Change Authority, although may delegate it to other while still being responsible.
3. The Biggest Changes or Issues:
These require the attention of the Project Board, or if at project-level Tolerances, be escalated up to Corporate, Program or Customer levels. When a change could significantly impact project objectives or benefits, the top guns step in.
A Few Golden Nuggets on PRINCE2’s Approach
- Every change or issue gets documented. Nothing flies under the radar.
- Assess the impact. Before approving a change, its effect on the project’s timescales, costs, risks, and benefits gets evaluated.
- Keep everyone in the loop. Stakeholders, teams, and anyone impacted by the change should be informed and updated.
Bringing It All Home
Project management isn’t just about planning. It’s about navigating changes efficiently. And with PRINCE2’s structured approach to changes and a handy change budget, you’ve got a roadmap to navigate any storm.
PRINCE2 Change Budgets & Tolerance: The Dynamic Duo
By now, we’ve dived deep into the waters of change budgets, types of changes, and who’s got the power to approve what.
But wait – there’s one more layer to this PRINCE2 onion, and that’s the concept of Tolerance. It plays a pivotal role in deciding change authority levels. Intrigued? Let’s unravel this!
Tolerance: The Flex in Your Project
Imagine you’re on a road trip. You’ve mapped out your route, but you’ve also allowed a little wiggle room for those unscheduled stops – maybe a surprise scenic overlook or that tempting roadside diner. That wiggle room? That’s Tolerance in the PRINCE2 world.
In simpler terms, Tolerance is the acceptable deviation from a plan before escalating the issue or change to a higher authority. Consider it a buffer around time, cost, scope, risk, benefit, and quality. So, if things stray too far off course, it’s time to check in with someone higher up the ladder.
Tolerance & Change Authority: The Dance
Here’s how the magic happens:
1. Within Tolerance:
If a change stays within the defined tolerance levels, the Project Manager can typically handle it. It means the deviation won’t blow the budget or drastically mess up the timeline.
Example: A design element in an app development project might take two days longer than anticipated. The Project Manager would handle this without escalating if the time tolerance was set at five days.
2. Exceeding Tolerance:
If a change or issue pushes the project outside its tolerance boundaries, it’s time to escalate. This is when our friends at the Change Authority or Project Board come into play.
Example: A feature addition in the software project might add 10% to the budget. If the cost tolerance was only 5%, it’s time to discuss this with the Change Authority.
Why Tolerance Matters in Decision Making
- Efficiency: Only some changes need to involve top-tier decision-makers. Tolerance levels ensure that only significant deviations get escalated, allowing higher-ups to focus on the big picture.
- Clarity: Clearly defined tolerance levels set the boundary conditions. Everyone knows their decision-making authority, reducing confusion and streamlining processes.
- Risk Management: Tolerance is a safety net, ensuring potential risks are spotted early. If something’s veering too far off track, the escalation ensures it gets the right level of attention.
Tying It All Together
So there you have it. The concept of Tolerance is like the unsung hero in PRINCE2, ensuring that projects have just the right amount of flexibility without going off the rails. Combine this with a solid understanding of change budgets and Change Authority, and you’ve got a powerful toolkit for managing projects, PRINCE2-style.
Remember, it’s all about balance. Stick too rigidly to a plan, and you’ll miss opportunities. But stray too far, and chaos ensues. With PRINCE2’s structured approach, you get the best of both worlds. So, embrace those changes, set your tolerances, and manage like a pro!
This course is DEPRECATED
The old PRINCE2 6th Edition Foundation and Practitioner syllabus was upgraded in 2024. Check out the brand NEW PRINCE2 7th Edition Masterclass, covering all the current syllabus, training material and online exam benefits HERE

Your Route To PRINCE2 6th Edition Practitioner
Study PRINCE2 6 Foundation and Practitioner Exams with our famous on-line course with streaming HD Video Lessons, study guides and mock exams. In the last fifteen years we have had 6,000+ Academy students successfully transform their careers as PRINCE2 Practitioners.