PRINCE2 7 Walkthrough – Step ONE

A PRINCE2 project can be standalone or part of a programme, in which case a project may be triggered from either those within a programme, here called programme management or by appropriate senior management within an organization, here called corporate management.

PRINCE2 Overview

A PRINCE2 project is therefore triggered by either of the above by issuing a Project Mandate. This document should contain as a minimum, the name of the prospective project board executive and the reasons for the need for the project.

As such it may only be verbal instruction or possibly an e-mail. At the other extreme, it could be the final report from a feasibility study. Whichever, it must contain sufficient information provided by an appropriate authority level, to trigger the first PRINCE2 process.

The first PRINCE2 process is called Starting Up a Project and uses the initials SU. This occurs pre-project, and is used as a solid foundation before the first stage in a PRINCE2 project.

Developing detailed plans can consume a lot of resources, and since many projects should not even be started in the first place, it makes sense for SU to be used as a ‘filter’ – both to prevent poorly conceived projects from starting in the first place, and to establish an understanding of the goals and objectives of the project.

In particular, to ensure that there are good business reasons to proceed with the PRINCE2 project.

One of the first activities is to appoint the Executive of the PRINCE2 Project Board and the Project Manager; the Executive will now design and appoint the remaining roles within the Project Board including who will fill the Senior User and Senior Supplier roles, and how Project Assurance is to be handled.

The project manager will design and appoint any other supporting roles that will be needed such as project support, configuration management and the optional Team Manager role.

Two main PRINCE2 management products are an output from this process, the Project Brief and a plan for the Initiation Stage.

The Project Brief contains the outline Business Case with sufficient information to justify carrying out the initiation stage, and creating the Project Product Description which includes aspects such as the user’s quality expectations and acceptance criteria for the end product of the project.

The Project Brief also contains the Project Approach management document. This lays out the approach used by the project to deliver the end product, for example, basing the design on an existing product or developing an entirely new design, or whether or not resources used for the project will be provided internally or by the use of third parties.

The PRINCE2 Project Brief can be seen as a refinement of the Project Mandate, and similarly the Project Brief will be refined further within the initiation stage to become the Project Initiation Documentation (PID).

One important principle of PRINCE2 is that of management by exception. The purpose of this is to set tolerance levels at the directing, managing, and delivering management levels within a project. Tolerance is defined as a limit within which a particular level may manage without the need to escalate to the next level above.

There are seven PRINCE2 objectives against which tolerances may be set: time, cost, quality, scope, risk, sustainability and benefits. If any of these tolerances are forecast to be exceeded, then an Exception Plan must be raised which if approved would replace the existing plan that would have no longer been completed within tolerance.

The business management (commissioning) level has the authority to set PRINCE2 project level tolerances, the Project Board have the authority to set stage level tolerances, and optionally, the Project Manager may set tolerances around a particular Work Package.

One of the PRINCE2 principles is learning from experience. For this reason, the Lessons Log is created and filled with any lessons that can be learned from appropriate individuals and previous similar projects. The project manager would be expected to proactively collect such data.

The Lessons Log will be updated and used throughout the PRINCE2 project, in particular as a source of information to create the optional Lessons Report at the end of each stage, and the Lessons Report that is created as part of the Closing a Project process. In this way, lessons can be passed on to future similar projects.

The Daily Log is also created by the project manager, and is used as a ‘diary’ by the project manager for the remainder of the project. But here in SU, it is also used to capture any risks and issues that need to be managed prior to the formal start of the project.

To proceed any further, the newly formed project board will need to decide whether or not it is worth investing in the creation of the PID. In particular how much work effort and resources are needed in the initiation stage.

In this way, poorly conceived projects can be nipped in the bud before any further effort is wasted upon them. By the same token, the information contained within the Project Brief and the initiation Stage Plan will give the project board sufficient information to make an informed choice.

The Starting Up a Project process culminates with the project manager requesting that the project board consider authorizing the initiation stage. This uses the first activity ‘authorize initiation’ within the directing a project (DP) process.

The project board may decide not to proceed any further. However let’s assume that in this instance they agree based on the evidence above to invest in the initiation stage, then this will become the formal start of the project, and corporate/programme management will be informed that the project is initiated.

Prince2 7Th Edition Process And Products Roadmap
PRINCE2 7 Walkthrough 1

To be continued…check out part 2 of my PRINCE2 Walk Through…

This course is DEPRECATED

The old PRINCE2 6th Edition Foundation and Practitioner syllabus was upgraded in 2024. Check out the brand NEW PRINCE2 7th Edition Masterclass, covering all the current syllabus, training material and online exam benefits HERE

5.0
Prince2 Practitioner Masterclass

Your Route To PRINCE2 6th Edition Practitioner

Study PRINCE2 6 Foundation and Practitioner Exams with our famous on-line course with streaming HD Video Lessons, study guides and mock exams. In the last fifteen years we have had 6,000+ Academy students successfully transform their careers as PRINCE2 Practitioners.

  • Bite Sized Lessons  The sheer size of PRINCE2 can be daunting. The Masterclass will guide you through the syllabus in easy to consume bite sized lessons
  • Be prepared and confident for the exams  Test your knowledge in a fun, entertaining environment with the PRINCE2 Foundation & practitioner exam revision tools
  • Enjoy yourself!  This PRINCE2 Foundation & Practitioner online course is broken into bite-size lessons, combining leading edge multimedia and interactive exercises for optimum enjoyment and knowledge retention
  • Feel confident with full tutorial support  Benefit from fast access to experienced, one-to-one learning support as you study via email and phone, so there is no need to feel isolated while you are learning
  • Take your time  Study at your own pace by bookmarking your progress and picking up where you left off at a speed that suits you

Dave Litten


Dave spent 25+ years as a senior project manager for UK and USA multinationals and has deep experience in project management. He now develops a wide range of Project Management Masterclasses, under the Projex Academy brand name. In addition, David runs project management training seminars across the world, and is a prolific writer on the many topics of project management.

Your Signature

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}
Insert Content Template or Symbol

Join NOW!

Boost Your Career Now!

15% Discount on all courses with Coupon Code - PROJEX15