Change Control within PRINCE2

No matter how many projects you will work on in your professional life, every single one of them will be subject to some form of change control, whether it’s your customer changing their mind or specification problems, or the outside world changing, change and hence change control, is inevitable.

It therefore makes good sense to embed a process for managing change at the start of each project, and this must include a systematic change control approach that covers the identification, assessment and control of any changes that arise.

In PRINCE2 all changes are treated as a type of project issue, and these will be subject to change control. Any issues that the potential to impact the project’s performance targets of time, cost, quality, scope, risk and benefits.

It is often misunderstood, but be objective of issue and change control procedures are not to prevent changes, but rather, to ensure that every change is first agreed by the relevant authority before it is implemented.

The first important aspect to consider is the answer to the question “how will we know when a change is requested to what we currently have?”.

The answer is to record the version details of each PRINCE2 product, both management and specialist products, and once they had been signed off they are called a Baseline that will be used for PRINCE2 change control.

Therefore, a pre-requisite of affective issue and change control is the establishment of an appropriate PRINCE2 configuration and management system which records baselines for the project products and ensures that the correct versions are delivered to the customer.

There is therefore a very close relationship between PRINCE2  change control and configuration management, for this reason the change control administration normally takes place within your configuration management group. Within PRINCE2, configuration management is normally supplied from within Project Support.

It is therefore important within PRINCE2 that all issues and changes that may affect the projects baselines, first identified, then assess, and either approve, rejected or deferred.

In PRINCE2, configuration management is the technical and administrative activity concerned with the creation, maintenance and controlled change of configuration throughout the life of a product (or item). A configuration item is an entity that is subject to configuration management. The entity may be a component of a product, a product or a set of products that form a release.

A release is a complete and consistent set of products that are managed, tested and deployed as a single entity to be handed over to the user(s). Issue and change control procedures need to be integrated with the configuration management system used by the project.

PRINCE2 Change Control elements.

PRINCE2 uses the term ’issue’ to cover any relevant event that has happened, was not planned, and requires management action. It can be a concern, query, request for change, suggestion or off-specification raised during a project. Project issues can be about anything to do with the project.

Issues may be raised at any time during the project, by anyone with an interest in the project or its outcome. The different types of issue that are subject to PRINCE2 change control are:

Request for change. A proposal for a change to a baseline. For example, the Senior User would like to upgrade the processor speed for an IT system to comply with the latest software release.

Off-specification. This is something that should be provided by the project, but currently is not (or is forecast not to be) provided. An example here, is a piece of functionality is missing, or a product that is missing.

Problem/concern. Any other issue that the Project Manager needs to resolve or escalate. For example, advice from a supplier that they can no longer deliver one of the products specified by the customer.

This course is DEPRECATED

The old PRINCE2 6th Edition Foundation and Practitioner syllabus was upgraded in 2024. Check out the brand NEW PRINCE2 7th Edition Masterclass, covering all the current syllabus, training material and online exam benefits HERE

5.0
Prince2 Practitioner Masterclass

Your Route To PRINCE2 6th Edition Practitioner

Study PRINCE2 6 Foundation and Practitioner Exams with our famous on-line course with streaming HD Video Lessons, study guides and mock exams. In the last fifteen years we have had 6,000+ Academy students successfully transform their careers as PRINCE2 Practitioners.

  • Bite Sized Lessons  The sheer size of PRINCE2 can be daunting. The Masterclass will guide you through the syllabus in easy to consume bite sized lessons
  • Be prepared and confident for the exams  Test your knowledge in a fun, entertaining environment with the PRINCE2 Foundation & practitioner exam revision tools
  • Enjoy yourself!  This PRINCE2 Foundation & Practitioner online course is broken into bite-size lessons, combining leading edge multimedia and interactive exercises for optimum enjoyment and knowledge retention
  • Feel confident with full tutorial support  Benefit from fast access to experienced, one-to-one learning support as you study via email and phone, so there is no need to feel isolated while you are learning
  • Take your time  Study at your own pace by bookmarking your progress and picking up where you left off at a speed that suits you

Dave Litten


Dave spent 25+ years as a senior project manager for UK and USA multinationals and has deep experience in project management. He now develops a wide range of Project Management Masterclasses, under the Projex Academy brand name. In addition, David runs project management training seminars across the world, and is a prolific writer on the many topics of project management.

Your Signature

{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}
Insert Content Template or Symbol

Join NOW!

Boost Your Career Now!

15% Discount on all courses with Coupon Code - PROJEX15